Leli Hoshana Rabba Motzei Shabbos הושענא רבה
-Aravos, Hoshanos available at BMG Sukka 7th street and other shuls around Lakewood
-Mishna Torah משנה תורה Barditchev Kloiz 9:30
-Roberts shul HOSHANA RABA ALL NIGHT LEARNING Refreshments
SHACHRIS NETZ 6:37(7:17)& 8:30
-KZY (R' Gissinger) Shiur from Rav Nosson Stein 10:00 pm followed by seder
-Mishna Torah 9:00 pm R' Perl Bais Shmuel
- Bais Mordechai Mishna Torah 10:00, followed by meleva malka/Simcha's Bais hashoeva. Tehillim by chatzos. Shachris 8:00 AM.
Shmini Atzeres- Hadlokas Neiros 5:47 Shkiah 6:05
Roberts shul- DRASHA HORAV SHLOMO CARLEBACH SHLITA before Maariv
Simchas Torah
BMG Hakafos will be in Bais Aron
Motzei Simchas Torah Tuesday night Hakafos shniyos with music at Pine River Village shul 36 Goldcrest Minhag Adot Hamizrach
Important Reminder:
ReplyDeleteTonight, Wednesday Oct. 26th at 6:00 PM there will be a planning board meeting.
While the provided agenda lists one liners, here are the details behind tonight's agenda. If you care about changing the status quo - be there tonight and let's have a strong showing to make a large impact.
Wednesday October 26 - Planning Board meeting at 6:00 PM (Isru Chag)
PUBLIC HEARING Agenda - See bolded applications for the ones that need to be opposed.
Please attend this meeting and speak up when the public is invited to comment on each application.
After looking into just 6 of the applications, the applicants are attempting to build 65+ houses using a combined 28 variances!!!!
1. SP 2144 Yosef Hirsch East County Line Road Block 208.01, Lots 14 & 15 Preliminary and Final Major Site Plan for a mixed use site (retail, office, shul)
2. SD 2119 1495 East Spruce, LLC East Spruce Street Block 855.01, (East Spruce between New Hampshire and Albert) Lots 26 & 29 Subdivision to create five lots
~ Variances include:
1) Minimum lot area - Where 20,000 sqft is required they want only 15,000 sqft
2) Minimum lot width - Where 100 feet is required they want as little as 51-53 feet for some lots.
5. SD 2157 Dovid Berger Second Street (NW corner of Route 9 and 2nd Street!!) Block 72, Lot 7.01 Subdivision to create 5 lots
~ Variances include
1) Minimum lot area - Where 10,000 sqft is needed, they want only 9,000 - 9,500 sqft.
2) Minimum front yard setback to Route 9 - Where 75 feet is required they want only 19 feet!
3) Minimum side yard setback - Where 7 feet is required they want only 5 feet
4) Maximum building coverage - Where 30% is allowed they want up to 40%!!
5) Minimum side yard setback - where 12 feet are required they want only 5 feet.
6) Minimum Combined side yard setback - Where 25 feet is required they want only 11!!
6. SD 2159 Mark Properties, LLC Providence Avenue Block 1048, Lots 1 & 5 (Behind Presidential) Subdivision to create 11 lots.
ReplyDelete~ Variances include:
1) Minimum lot area - Where 10,000 sqft are required they want 6-7,000 sqft for the single family houses.
2) Minimum Lot width - Where 75 feet is required they want between 60-70 feet
3) Minimum front yard setback - Where 30 feet is required they want only 25 feet.
4) Minimum rear yard setback - Where 20 feet is required they want only 10.
5) Minimum side yard setback - Where 10 feet is required they want only 7.5 feet.
6) Minimum Aggregate Side yard setback - Where 25 feet is required they want only 15 feet
7) Maximum building coverage - Where 30% is permitted they want 35%
7) SD 2161 Aaron Finkelstein Central Avenue Block 77, Lot 2 Minor Subdivision to create two lots
8. SP 2198 ARM Land Group, LLC Lanes Mill Road Block 189.04, Lot 196 Preliminary and Final Major Site Plan to convert an existing house to a school and build a new dormitory
9. SP 2199 Harold Herskowitz Third Street Block 91, Lot 6 Preliminary and Final Major Site Plan for a 5 story office and retail building - Conforming application - no variances
10. SD 2162 LS Holdings, LLC Locust Street Block 1083, Lot 1 (corner of Locust and Vermont) Subdivision to create nine lots (mix of duplexes and townhouses)
~ Variances for the duplexes include:
1) Minimum Lot Area - Where 8,500 sqft is needed, they want only 8,250
2) Minimum Front Yard Setback - Where 15 feet is required they want only 10 feet
3) Minimum Rear Yard Setback - Where 15 feet is required they want only 10 feet
Variances for the townhouses include:
1) Minimum Rear Yard Setback - Where 20 feet is required they want only 10 feet
2) Minimum Side Yard Setback - Where 20 feet is required they want only 17.5 feet
3) Maximum Building Coverage - Where 35% is allowed - they want 36%
There does not appear to be adequate off street parking
11. SD 2163 ARM Developers, LLC Prospect Street Block 445, Lots 17.01-17.12 & 18 (SW corner of Prospect and Mass.) Subdivision to create thirty two lots (duplexes) and a cul de sac
~ Variances include:
1) Minimum Front Yard Setback - Where 25 feet is required they want a smaller setback
2) Minimum Rear Yard Setback - Where 15 feet is required they a smaller setback
12. SD 2164 Barbara Flannery Atlantic Avenue Block 377, Lots 26.04-26.08 Minor Subdivision to adjust lot lines (no additional lots)
13. SD 2146 Mordechai Eichorn Central Avenue Block 12.04, Lot 48 (Central - across from Hollywood Ave) Subdivision to create three lots ~ ~Variances include:
1) Minimum lot area - Where 12,000 sqft is required they want only 11,250 sqft.
2) Minimum lot width - Where 90 feet are required they want only 75 feet
3) Side yard setback - Where 25 feet are required they want only 20 feet
There aren't enough parking spots in the driveways for the number of cars.
Where's the Planning Board Agenda for tonight?
ReplyDeleteHere is the official agenda. http://www.lakewoodnj.gov/images/db/sforsyth-2464-10-26-16-PUBLIC-HEARING-AGENDA.pdf
ReplyDeleteSee above for the real agenda listing all of the variances which must be opposed.